Orbit Security Group
← All solution briefs

Network and gates where fiber never reached

Bus yards, maintenance lots, landfills, water sites, and public-works yards — Cambium PtMP, remote gate intercoms, and cameras on property the town owns.

Fleet and bus lots — representative still. Network and cameras where the vehicles park, not only at town hall.
Fleet and bus lots — representative still. Network and cameras where the vehicles park, not only at town hall.

The problem

Most boroughs have network at town hall — and a bus yard, landfill, pump house, or maintenance lot that still has no path. Trenching across a compound is slow and expensive. Consumer cameras at the clerk window do not help the scale house or the fleet gate after hours.

Staff cannot drive to every yard after an alarm. One operator should be able to see the gate, talk to the driver, and release the lock from the desk — without a standing guard contract or intersection plate readers on public roads.

  1. 01

    Point-to-multipoint from town hall

    Cambium cnWave PtMP when line of sight exists — from the main building or a pole with power and light to several far drops: pole camera, small switch, Gate Hub, and Protect at the lane.

  2. 02

    Remote gate & intercom

    G3 Intercom or Reader Pro at the yard or landfill gate; Gate Hub on the radio path; Intercom Viewer or the Access app at the desk for see-talk-release.

  3. 03

    Remote WAN corners

    Starlink or cellular into a Cambium NSE at parks and pump sites with nothing to extend from — same Cambium hops branch from that head-end.

  4. 04

    LPR & lobby analytics

    License plate recognition at fleet entrances, maintenance drives, and transfer lanes on municipal property. Optional facial recognition in lobbies for staff and registered visitors — policy first.

  • Cambium PtMP or remote WAN path notes
  • Gate and intercom schedule with remote-release routing
  • Camera, LPR, and lobby analytics plan
  • Orderable hardware list and install handoff

Buy the list. Install your way.

Order from the distributors you already use. Install with your facilities team, electrician, or preferred integrator. Full Support stays through commissioning.

Full industry page →

Two-page PDF

Same content as this page — for a board packet or a conversation with facilities.

Engagement model and 2026 design bands: How We Work.

Start with a conversation

Send the address and what has to work. Floor plans beat site photos when you have them.

Request a design consultation